Christmas Shutdown Charter Flights: Getting Australia’s FIFO Workforce Home

Front View of Sleek White Private Airplane on remote airstrip

Christmas Shutdown Charter Flights: Getting Australia’s FIFO Workforce Home

For workers on remote sites, the last crew change before Christmas is an important one. For the people organising travel, it can also be one of the busiest.

A shutdown may involve hundreds of workers leaving within a few days, sometimes heading to different cities. Then, after New Year, everyone needs to get back in time for the restart.

Getting those movements organised takes more than finding enough seats. Aircraft availability, rosters, baggage, airport access and ground transfers all need to work together.

At AVMIN, we coordinate charter flights for mining, resources, construction and government workforces across Australia. Starting the conversation early gives us more time to assess options and build a departure and return program around your requirements.

Getting everyone out — and back again

Many sites aim to move most of their workforce home within a tight window, while essential personnel remain behind.

The last shift is a starting point for the schedule. Crews may need time to return to camp, collect their belongings and travel to the airport before they can board.

At the other end, some workers will be home after a short drive. Others may have a connecting flight or a longer road journey ahead. Those connections need to be considered when setting the charter times.

The January return deserves the same attention. When do crews need to arrive? Is accommodation ready? Are transfers available? Do some teams need to return earlier to prepare for the restart?

Planning both directions together helps identify these details before bookings are confirmed.

Matching the aircraft to the movement

A small group of essential staff may need a very different aircraft from the main shutdown workforce.

AVMIN can assess options ranging from smaller turboprops carrying around six passengers through to regional aircraft and larger passenger jets, including configurations of around 176 seats, subject to availability and suitability.

But seat numbers are only part of the decision.

The operator also needs to assess runway suitability, flight distance, fuel requirements, passenger and baggage weights, and operating conditions. An aircraft with enough seats may not be able to carry the full group and their bags on the proposed route.

For a larger workforce, several flights or departure hubs may be needed. We work through those options with you rather than assuming everyone needs to travel on one aircraft.

Choosing the right airport

Flying directly from a mine airstrip can be convenient where access is authorised and the aircraft can operate there. In other cases, a regional airport with a coordinated bus transfer may be the more practical option.

A shutdown plan might involve workers travelling from Cloncurry to Brisbane, from the Pilbara to Perth or from a remote Northern Territory project to several home destinations.

Across Australia, the airport options will depend on the project:

  • Queensland: regional centres serving the Northwest Minerals Province, Bowen Basin and Surat Basin, including Cloncurry, Mount Isa, Moranbah, Emerald and Roma.
  • Western Australia: airports serving Pilbara, Goldfields and Kimberley projects, including Karratha, Port Hedland, Newman, Kalgoorlie and Broome.
  • Northern Territory: regional airports such as Darwin, Katherine and Alice Springs, along with suitable project airstrips.
  • South Australia: options around resources operations in the state’s north and the Cooper Basin.
  • New South Wales, Victoria and Tasmania: regional airports and capital-city connections suited to the workforce’s departure points and project location.

These are starting points for a discussion. Each itinerary needs to be assessed individually, including airport access and the journey between the airport, camp and site.

Allow for summer conditions

Christmas travel coincides with summer, which brings additional considerations for remote operations.

High temperatures can affect aircraft payload. Across northern Australia, wet-season weather may also affect flights, airstrip conditions and road transfers.

These factors need to be considered with the aircraft operator and relevant airport or site contacts when building the plan.

It also helps to agree who will receive updates and who can approve changes if a movement is disrupted. AVMIN’s 24/7 support team can coordinate with operators and keep your nominated contacts informed while available alternatives are assessed.

Don’t leave the smaller groups out of the plan

The main workforce departure usually gets the most attention, but there may be supervisors, maintenance teams or essential personnel travelling on different dates.

Government departments and contractors may also need to maintain services in regional and remote locations throughout the holiday period.

Smaller aircraft or separate departures may suit these movements. Including them in the initial brief helps us assess the full program and account for people returning earlier or staying longer.

What to send us

You don’t need every passenger name confirmed before contacting AVMIN. Initial estimates give us enough to start assessing options.

Useful information includes:

  • Shutdown departure dates and January return dates
  • Passenger numbers for each flight, in each direction
  • Departure locations and preferred destinations
  • Last-shift times and required arrival times for the restart
  • Baggage, tools and equipment requirements
  • Ground transfer requirements
  • Any client-specific aviation standards
  • Flexibility in dates, times or airports

If workers need connecting flights, let us know. It helps to consider those arrangements before setting the charter schedule.

Aircraft availability can be limited during the holiday period. A quote does not necessarily mean an aircraft is being held, so we’ll explain what is required to secure the flights and the conditions that apply.

One team coordinating the details

AVMIN sources aircraft across a network of operators and coordinates the agreed charter services under one contract.

Whether your shutdown involves one flight or several aircraft travelling from different locations, you have one accountable partner to work with as the details develop.

Planning your Christmas shutdown movements? Send us the information you have, and we’ll talk through suitable options for getting your workforce home and back again.

Explore our FIFO charter services, email sales@avmin.com.au or call 1300 286 462.

FAQs

  • When should we start planning Christmas shutdown flights?

    Start several months ahead wherever possible, particularly for larger groups or movements within a narrow travel window. If your dates are approaching, contact AVMIN with your current requirements so we can check available options.

  • Can a charter depart directly from a mine site?

    Potentially, where airstrip access is authorised and the operator confirms it is suitable for the proposed aircraft and flight. Otherwise, we can assess nearby regional airports and any required ground transfers.

  • Can AVMIN arrange flights for both small teams and large workforces?

    Yes. We can assess aircraft options for smaller groups through to larger workforce movements. The suitable capacity depends on the aircraft configuration, route, baggage and airport requirements.

  • Can we request a quote before passenger numbers are final?

    Yes. We can work from estimates and explain the assumptions used in the proposal. Pricing, aircraft suitability and availability will need to be reviewed as the requirements are confirmed.

  • Can the January return flights be arranged at the same time?

    Yes, and we recommend considering both directions together. This helps align the flights with restart dates, transfers and any teams that need to return earlier.